Virtual Meter Instructions

Main Menus

Inital Setup Procedure
  1. The instruction sets with the Nova VirualMeter describe the setup of the controller. During setup, it is best to program the groups in the following order
    1. Input Group - This Group MUST be set up first!
    2. Output Group
    3. Alarm Group
    4. Retransmit Group
    5. Set Point Group
    6. Auto-Tuning Group
      The Input group is the only group required to be set up in this order. Other than the input group being set up first, this list is only a suggestion, and those experienced with the Nova or other PID controllers may choose not to follow it.
The Nova VirtualMeter assumes a 22°C or 72°F ambient temperature while programmed for a temperature input.